List of Completed Projects

Building Works

Year 2021
  • Proposed Santubong Archaeological Park At Sungai Jaong On Lot 117, 236, 237, 238, 295, 297, 322, 327, 328, 331, 332, 347, 428, 475, 515, 516 And Parts Of Lots 235, 321, 330, 514, Block 3, Salak Land District, Santubong, Kuching, Sarawak.
  • The Construction And Completion of 23 Units of Double Storey Terrace And Associated Civil Engineering Work For The Proposed Housing Development On Lot 13151, Section 65, Kuching Town Land District.
  • The Proposed 2 Units of Double Storey Semi-Detached Houses (S/L 24&25) on Lot 13151, Section 65, KTLD, Jalan Depo, Kuching.
  • Cadangan Naiktaraf Masjid Al-Muttaqin Bahagian Samarahan, Jalan Datuk Mohammad Musa Di Atas Lot 8383, Block 59, Muara Tuang Land District, 94300, Kota Samarahan, Sarawak.

Year 2019

  • The Construction & Completion of The Proposed 28 Units of Single Storey Semi-Detached Houses, 10 Units of Double Storey Terrace Houses And Associated Infrastructure Works On Lot 6059 (Previously Lot 6004), Block 9, Salak Land District, Jalan Sultan Tengah, Kuching, Sarawak. (Phase 9B)
  • Proposed New Workshop, Ancillary Buildings, Weighbridge, Office Renovation And Other Associated Works At Sibanyis Quarry Located at Mile 15, Kuching-Serian Road, Kuching.
  • Construction & Completion of The Proposed Rumah Seri Kenangan On Lot 1803, Block 4, Sentah – Segu Land District (Phase 2) At 12th MIle, Jalan Kuching-Serian, Kuching.
  • The Construction and Completion of the Proposed 60 Units of 4-Storey Walk-up Apartment Development On Lot 4648, Block 1, Samarahan Land District, Sarawak.
Year 2017
  • Proposed 20 Units of 3 & 4 Storeys Shophouses On Part Of Lot 7687 (Parent Lot 5569), Block 9, Salak Land District at Bandar Samariang, Kuching, Sarawak (Area S3E).
  • Proposed St. Ann Church Building On Lot 1564, Block 71, KCLD, 10th Mile, Penrissen Road, Kuching (Phase 1).
  • Proposed 3 Storey Showroom Cum Office With Mezzanine Floor and Roof Parking On Lot 198 (Plot 1) Section 64, KTLD, Jalan Datuk Abang Abdul Rahim.
Year 2016
  • Construction and Completion of the Proposed 37 Units 3 Storeys Shophouses Including Associated Infrastructure and Civil Works on Lot 639 & Lot 1413 Both of Block 25 Muara Tuang Land District, at Kuching-Kota Samarahan Expressway, Samarahan Division, Sarawak.
Year 2015
  • The Construction and Completion of the Proposed 48 Units Single Storey Semi-Detached Houses On Lot 3626, Block 14, Salak Land District, Jalan Sultan Tengah, Kuching Family Park (Phase 7-Stage 1).
  • The Construction and Completion of the Proposed 72 Units of 3-Storey Walk-up Apartment (block C, D & E) at Phase 3B On Lot 1065, Block 14, At Riveria, Muara Tuang Land District, Sarawak.
  • The Construction And Completion of 47 Units Of Double Storey Terrace Houses And Associated Infrastructure Works On Lots 5154-5162, 5167-5172 & 5187-5193, Block 9, Salak Land District, Off Jalan Sultan Tengah, Kuching, Sarawak (Block 7 Stage 3).
  • Proposed 3-Storey Shophouses (Sublot 1-6, 7-13, 14-19, 20-26, 27-32, 33-39, 40-45, 46-52, 53-58, 59-65, 66-71, 72-78, 79-84 & 85-91) On Lot 13771 (Part of Parent Lots 5626, 5627 & 6474), Section 65, KTLD, Jalan Matang Lama, Kuching, Sarawak (Block 6).
  • The Construction and Completion Of The Proposed 46 Units of Single Storey Terrace Houses On Part Of Lot 3993 Phase 2 (Part Of Parent Lot 847) Block 9, Salak Land District (Block 14 Phase 2).
Year 2014
  • Proposed 44 Units of 3-Storey Shophouses (Sublots 102-109, 110-117, 118-125, 126-133, 134-139 & 140-145) On Lot 13768 (Part Of Parent Lots 5626, 5627 & 6474), Section 65, Kuching Town Land District, Jalan Matang Lama, Kuching.
  • Proposed Double Storey Residential Terrace House On Lot 2216, Block 17, Salak Land District, Kuching, Sarawak (Phase 1 & Phase 2).
Year 2013
  • The Construction And Completion Of The Proposed 66 Units Of 3-Storey Walk-up Apartment (Block A, B & F) At Phase 3B On Lot 1065, Block 14, At Riveria, Muara Tuang Land District, Sarawak.
  • Proposed Private Specialist Hospital On Sublot 1 of Lots 9887, 9888 & 9889, Section 64, Kuching Town Land District At Jalan Tun Jugah, Kuching (New Lot 10992).
  • Design & Build Negotiated Contract – The Proposed Site Investigation, Survey, Design, Supply, Delivery, Construction, Completion Including Testing and Commissioning Of A New Storage Tank at Long Lama Treatment Plant, Miri Division, Sarawak.
  • Project Pemasangan Paip Utama Untuk Zon 60 di Tun Ahmad Zaidi Adruce, Sibu.
  • Proposed 44 Units of Single Storey Terrace House (Water Lily) And Infrastructure Works At Phase 14 On Part Lots 3148, 3142 & 5868, Block 1, Desa Ilmu, Samarahan Land District.
  • Twenty-Eight (28) Units Single Storey Semi-Detached Houses (Type 1-IV), Lot 3626, Block 14, Salak Land District, Jalan Sultan Tengah for Kuching Family Park (Phase 6 Stage 3).
Year 2012
  • Construction & Completion Of The Proposed 44 Units Of Single Storey Terrace House (Water Lily) And Infrastructure Works At Phase 14 On Part Lots 3148 & 5868, Block 1 At Desa Ilmu, Samarahan Land District, Sarawak.
  • Construction & Completion Of The Proposed 32 Units Single Storey Semi-Detached Houses On Lot 3626, Block 14, Salak Land District, Jalan Sultan Tengah For KFP (Phase 6-Stage 2).
  • Proposed 1 Unit Single Storey Meeting House for the Church of Jesus Christ of Latter-Day Saints, Jalan Seladah, On Lot 12096 (Previously Lots 519 & 607), Block 16, KCLD, Kuching.
  • Proposed Crown Park Development at Lot 939, 4478, 4479, 5429, Section 64, KTLD, Jalan Datuk Abdul Rahim (KTS Garden)
    •  Main Building and Structural Works
    • External Infrastructure Works
    • Mechanical and Electrical Services
  •  Proposed 6 Units of Double Storey Semi-Detached House (Azalea) At Phase 2 On Lot 533, Block 14 At Riveria, Muara Tuang Land District, Samarahan Division.
Year 2011
  • New Car Showroom and Aftersales Center On Lot 375, Sublot 1 Block 17, Salak Land District, Petra Jaya, Kuching, Sarawak.
  • The Construction And Completion Of 50 Units Of Single Storey Terrace Houses On Part Of Lot 3993, Phase 1 (Part Of Parent Lot 847), Block 9, Salak Land District (Area Block 14, Phase 1).
  • Cadangan Project Pembinaan, Penaiktaraf Dan Pembaikpulihan Sekolah-Sekolah Dan Asrama Di Negeri Sarawak – SK Kem Pakit, Bahagian Sri Aman.
  • Cadangan Pembinaan Islam Malaysia, Lot 152, 153, 124, 127, 187 & 188, K.T.L.D, Jalan Jawa, Off Jalan P. Ramlee, Kuching, Sarawak (Multi Purpose Hall).
  • Building And Associated Works For Proposed Cement Storage And Packaging Terminal At Sibu For CMS Cement Sdn. Bhd.
  • Proposed 36 Units Single Storey Semi-Detached Houses On Lot 3626, Phase 1 (Part of Parent Lot 847), Block 9, Salak Land District (Area Block 14, Phase 1).
Year 2010
  • Proposed 3-Storey Kindergarten for Ching Kwong Methodist Church on Plot 1 on Lot 9418, Section 64, Kuching Town Land District at Jalan Tun Razak, Kuching.
  • Cadangan Perlaksanaan Projek Pembangunan 1,152 Units Rumah Pangsa Dan Kerja-Kerja Infrastruktur Berkaitan Di Desa Ilmu, Sarawak (Package A1 & A2 – 17 Blocks Of 4-Storey Apartment).
  • The Construction and Completion of the Proposed 18 Units of Double Storey Semi-Detached House (Allamanda II) Sublot 166 – 183 at Phase 2 on Lot 533 (Formerly known as Lot 531, Block 14 at Riveria, Muara Tuan Land District.
Year 2009
  • Proposed Regional Parts and Distribution Centre On Plot 2 Lot 2043, Section 66, KTLD, Jalan Belian, Kuching, Sarawak.
  • Design & Build Negotiated Contract Proposed Construction And Completion Of Sarawak Convention & Exhibition Centre. Internal & External Finishing (Package 11).
  • Cadangan Perlaksanaan Projek Pembangunan 1,152 Units Rumah Pangsa Dan Kerja-Kerja Infrastruktur Berkaitan Di Desa Ilmu, Sarawak (Package A1 & A2 – 17 Blocks Of 4-Storey Apartment).
  • The Construction and Completion of the Proposed Twenty Four (24) Units Single Storey Semi-Detached Type 1B, on Lot 3626, Block 14, Salak Land District, Jalan Sultan Tengah for Kuching. Family Park Phase 5 Stage 2.
Year 2008
  • 82 Units Of Single Storey Terrace House (Primrose) & Infrastructure Works at Phase 6 On Lot 533 (Formerly Known As Lot 531), Riveria, MTLD, Samarahan Division, Sarawak.
  • 10 Units Single Storey Semi-Detached Houses, Type 1 On Lot 3626, Block 14, Salak Land District, Jalan Sultan Tengah, Santubong, Kuching (Phase 5)
  • Proposed 16 Units of Single Storey Semi-Detached House (Dahlia) At Phase 2, Riveria.
  • Proposed 20 Units of Double Storey Semi-Detached House (Allamanda) At Phase 2, Riveria.
  • Proposed 82 Units of Single Storey Terrace House (Primrose) At Phase 6, Riveria.
  • Proposed 13 Units of Single Storey Terrace House (Primrose II) At Phase 6, Riveria.
  • 18 Units of Single Storey Terrace House (Ixora) & 4 Units of Single Storey Semi-Detached House (Pearl) At Phase 24, Desa Ilmu, Samarahan Land District.
Year 2007
  • Merekabentuk , Membina & Menyiapkan Perumahan Pasukan Gerakan Am, Jalan Batu Kawa, Kuching (Stage 1 – Package A – Kuarters Kelas ‘F’ Block B).
  • 42 Units Of D/S Terrace House (Iris), Phase 1, Lot 533, Riveria, Muara Tuang Land DIstrict, Samarahan DIvision.
  • Perodua Showroom, Service and Spare Parts Centre At Lot 5023, Jalan Sherip Masahor, Kuching.
  • 42 Units S/S Semi-Detached Houses On Lot 3626, SLD, Jalan Sultan Tengah, Santubong For Kuching Family Park Phase 4.
  • 24 Units of Double Storey Semi-Detached House (Allamanda), Phase 1, Lot 533 At Riveria, Samarahan.
  • 41 Units Single Storey Low Cost Plus Terrace House & 18 Units Single Storey Low Cost Terrace Houses, Lot 125, 126 & 283, Samarahan (Phase 2).
  • 8 Units Of Double Storey Terrace House (Jasmine) At Phase 1, Lot 533 At Riveria, MTLD, Samarahan.
  • 96 Units 4-Storey Walk-Up Apartments, Phase 21 On Part Of Lot 3170, Desa Ilmu.
Year 2006
  • EPCC Of Package 3 Bulk Depot Facilities And Package 4 LPG Bottling Facilities For IOT For Assar Chemicals Sdn. Bhd., At Senari, Kuching (Building Contract 1 & 2).
  • Proposed Masjid Bahagian Kapit And Pejabat Agama Islam Sarawak (JAIS) Dan Mahkamah Syariah Kapit, Sarawak.
  • Proposed Office Cum Workshop At Lot 1176, Muara Tabuan Light Industrial Park, Kuching.
  • 25 Units Of S/S Terrace House (Begonia) & 12 Units Of S/S Semi-Detached House (Delfodil Gold) At Phase 18 On Part Of Lots 2294, 3142, 3149 & 3170, Block 1 At Desa Ilmu, Samarahan Land District.
  • 44 Units Of Single Storey Semi-Detached House (Pearl) And 2 Units OF Double Storey Semi-Detached House (Jade) At Phase 20 On Part Of Lots 3149 & 3170, Block 1 At Desa Ilmu, Samarahan Land District.
  • 8 Units Of Three Storey Shophouses, 10 Units Of Single Storey Semi-Detached Houses And 57 Units Of Single Storey Terrace Houses On Lot 125, 126 & 283, Block 2, Samarahan Land District, Jalan Muara Tuang, Sarawak.
Year 2005
  • 7 Units of D/S Terrace House (Sapphire), 77 Units of Single Storey Terrace House (Crystal), 39 Units of Single Storey Terrace House (Crystal Plus) & 78 Units of Single Storey S/D House (Ruby) At Phase 15, On Lots 2294, 3142, 3149 & 3170, Desa Ilmu.
  • 320 Units 4 Storey Walk-Up Apartments, Phase 6 On Lots 2632, 3142 & 3149, Block 1, At Desa Ilmu, Samarahan Land District, Sarawak.
  • Cadangan Pembinaan Kolej Kediaman Pelajar Pakej II Di Kampus Tetap Universiti Malaysia Sarawak (UNIMAS), Kota Samarahan, Sarawak.
  • 15 Units Of D/S Terrace House (Sapphire), 67 Units of Single Storey Terrace House (Emerald) & 18 Units of Single Storey S/D House (Ruby Plus) At Phase 13, On Lots 2294, 2634 & Parts Of Lot 3170, Block 1, Desa Ilmu.
  • Additional Warehouse Facilities For FFM Flour Mills Complex on Lot 505, Block 8, At Sejingkat Industrial Park.
  • Proposed Multi-Storey Carpark On Lots 60 & 69, Section 32, Jalan Taman Budaya For The Sarawak Club, Kuching.
Year 2004
  • Proposed 144 Units Of Residential Houses At Phase 9, On Lots 2282, 3170 & 3189, Block 1, Desa Ilmu, Samarahan Land District, Sarawak.
  • Proposed 80 Units of Single Storey Semi-Detached House, Phase 3 Development On Lot 3626, Block 14, Salak Land District, Jalan Sultan Tengah, Santubong.
  • Proposed 52 Units of Single Storey Semi-Detached House At Phase 12, On Lots 3149 & 3170, Block 1, Desa Ilmu, Samarahan Land District, Sarawak.
Year 2003
  • Proposed 82 Units Of Single Storey Semi-Detached House, Phase 2 Development On Lot 3626, Block 14, Salak Land DIstrict, Jalan Sultan Tengah, Santubong, Kuching, Sarawak.
  • Projek Kemudahan Bangunan Mahkamah Lama, Kuching.
Year 2002
  • Proposed FFM Flour Mills Complex, Kuching.
    • Piling Works
    • Warehouse Building
    • Flour Mills Complex
  •  The Proposed 90 Units Double Storey Low Cost Terrace House Phase 1 On Lot 2267, Block 1 At Desa Ilmu Samarahan Land District, Sarawak.
  • Proposed Blessed Sacrament Church And Priest Quarter On Lot 2588, Block 16, Jalan Stutong, Kuching, Sarawak.
Year 2001
  • Proposed 17 Units 3-Storey Shophouses On Lots 215 and 2132, Block 218, KNLD At Jalan Batu Kawa, Kuching, Sarawak.
  •  Proposed Mini Sports Stadium, Asajaya, Kota Samarahan.
  • Proposed New Public Library For Sarikei District Council On Lot 810, Block 19, Sarikei Land District.
Year 2000
  • Construction For 1st Silicon Wafer Fab Kuching, Samajaya Free Industrial Zone, Kuching.
    • Package: Workers’ Camp Package
    • Package: Extension To Workers’ Camp
    • Package: Extension To Workers’ Camp (Phase 3)
    • Package: Construction Of Site Office No. 3
    • Package: Construction Of Sub-Contractor Office
    • Package: Construction Of Site Warehouse
    • Package: Raised Access Floor
    • Package: Drywalls Partitions & Ceilings
    • Package: Vinyl Composition Floor Tiles
    • Package: Guardhouse, Gate, Signboard, Rubbish bin Centre & Second Entrance
    • Package: Misc. works & V.O. works
  •  Proposed Borneo Highlands Resort Golf Hotel, Kuching.
    • a. I.D. Works (Package 1)
    • b. I.D. Works (Package 2)
Year 1999
  • Proposed Reconstruction of Public Swimming Pool At Bukit Lima, Sibu, Sarawak.
    •  Public Swimming Pool
    • Grandstands
    • Existing Canteen & Changing Room
Year 1991
  • Construction and Completion of The Proposed Office/Warehouse/Workshop For Tractors Malaysia Berhad On Lot 483, Block 19, SLD, Sibu.
Year 1990
  • Construction and Completion of 4-Storey Building for MUI Bank Berhad on Lots 1138 – 1140, Block 4, Jalan Kampong Nyabor, Sibu.

Infrastructure Works

Year 2021
  • Design, Construction And Completion of Earthwork And Infrastructure Works For Rural Growth Centre At Long Lama, Miri (Phase 1).
  • Sarawak Water Supply Grid Programme – Stressed Areas Projek Rakyat: Design and Build – Proposed Remedial Works For RC Weirs and Riverbank Protection at Tapah & Sg. Serin Raw Water Intake, Serian Division, Sarawak.
Year 2020
  • Proposed Pipeline For Kampung Merakai, Serian Division.
Year 2019
  • Sarawak Energy Berhad (SEB) Additional Temporary Car Park On Lot 2886 (Partially), Block 7, Muara Tebas Land District, Sarawak.
Year 2017
  • The Construction and Completion of Proposed Demak Baru Phase 6, Kuching, Sarawak.
Year 2016
  • The Proposed Site Investigation, Survey, Design, Construction, Completion Of Rehabilitation Works to Slope Failure at Stenggan Tank Site, Bau, Kuching Division.
Year 2015
  • The Construction and Completion Of The Infrastructure Works For The Proposed Desa Ilmu Development To Part Of Lot 3021, Phase 25, Block 1 At Desa Ilmu, Samarahan Land District, Sarawak.
Year 2013
  • Projek Pemasangan Paip Utama Untuk Zon 60 Di Jalan Tun Ahmad Zaidi Adruce, Sibu, Sarawak.
  • The Infrastructure Works for the Proposed Civil Engineering Works on Lot 3626, Block 14, Salak Land District, at Jalan Sultan Tengah, Kuching, Sarawak (Phase 7).
  • Infrastructure Works for the Proposed Desa Ilmu Development Phase 29 on Part Lot 5868, Block 1 at Desa Ilmu, Samarahan Land District.
Year 2012
  • The Proposed Site Investigation Survey, Design, Supply, Delivery, Construction, Completion, Including Testing And Commissioning of A New  Ground Section Tank At Long Lama Treatment Plant, Miri Division, Sarawak.
  • Construction & Completion Of The Infrastructure Works For The Proposed Desa Ilmu Development Phase 29 On Part Of Lot 5868, Block 1 At Desa Ilmu, Samarahan Land District, Sarawak.
Year 2011
  • Cadangan Pembangunan Infrastruktur Kawasan Tupong, Petra Jaya, Kuching, Sarawak.
Year 2010
  • Cadangan Kerja-Kerja Pembangunan Landskap Dan Esplanade Di Jalan Gambier, Kuching.
Year 2009
  • Cadangan Perlaksanaan Projek Pembangunan 1,152 Unit Rumah Pangsa Dan Kerja-Kerja Infrastruktur Berkaitan Di Desa Ilmu, Sarawak (External Works Phase 1 – Package A).
Year 2008
  • Infrastructure Work – Riveria Development Phase 2 (Stage 2) On Part Of Lot 531, Block 14 At Riveria, Samarahan Division.
Year 2007
  • Infrastructure Works – Riveria Development Phase 1.
  • Infrastructure Work – Desa Ilmu Development Phase 24.
Year 2006
  • Infrastructure Work – Desa Ilmu Development Phase 17 & 23, Samarahan.
  • Infrastructure Work – Desa Ilmu Development Phase 16 On Part Of Lots 2294, 2634 & 3170, Block 1, SLD, Sarawak.
  • Infrastructure Work For The Proposed Desa Ilmu Development Phase 20 On Part of Lots 3149 & 3170, Block I At Samarahan Land District, Sarawak.
Year 2005
  • Infrastructure Work – Desa Ilmu Development Phase 13 On Lot 2294, 2634 & Parts Of Lot 3170, Samarahan.
  • Infrastructure Work – Desa Ilmu Phase 6 On Lots 2289 & 2955, Block 1, Samarahan Land District.
  • Supply, Delivery, Laying And Commissioning Of The Proposed Main Extension Of The Sistem Agihan Bandar Baru Sibu, Sarawak.
Year 2004
  • Infrastructure Work For The Proposed Desa Ilmu Development Phase 8 On Lots 2836 & 3149, Block 1, Samarahan, Sarawak.
  • Proposed Kampung Mang Extension, Samarahan Division.
Year 2003
  • Infrastructure Works – Desa Ilmu Development Phase 3, 4 & 5, Lot 2281, 2283 – 2288, 2293 & 2638, Block 1 Samarahan Land District.
  • Construction & Completion Of Kampung Bako Resettlement Scheme, Phase 2, Stage 1, Kuching.
  • Proposed Drainage Improvement Work Along Road To KS Shipping, At 3/4 Mile, Jalan Kubong, Limbang.
Year 2000
  • Earthwork For Flour Mill On Lot 505, Block 8, Muara Tebas Land District, At Sejingkat Industrial Park, Kuching.
Year 1999
  • Construction And Completion Of Kpg. Jaie Extension Scheme, Samarahan Division.
  • Slope Protection And Rehabilitation Works To The Existing Datu Muda Reservoirs Of KWB.
Year 1998
  • Earthwork To The Proposed New Water Treatment Plant No. 4 (Module 7) At Batu Kitang, Kuching, Sarawak.
Year 1997
  • Proposed Steel Sheet Pile Retaining Wall In Front of Existing Market Building At Bintawa Fishing Village Canal, Kuching.
Year 1996
  • Proposed Improvement To Existing Drainage Along Left-Side Of New By-Pass At Kota Samarahan.
Year 1994
  • Infrastructure Works To Rampangi Resettlement Scheme (Phase II) At Santubong Road, Kuching Division.

Rennovation/Restoration/Conservation Works

Year 2020
  •  Replacement Of Carpet & Blind for Public Mutual Berhad, Kuching Branch.
  • Renovation Works for Setting Up Red Carpet Banking Centre (RCB) at Nos. 7, 8, 9 & 10, Jalan Chan Bee Kiew, Off Jalan Padungan, 93100 Kuching, Sarawak for Padungan Branch.
Year 2019
  •  Renovation Works for 3-Storey Commercial Building At Block D2, Sublot 16 On 2251, (P/L 1407, 1408 & 1445), Section/Block 9, M.C.L.D. Miri, Sarawak-For Public Mutual Berhad @ Marina Times Square.
  • Renovation Works to Existing 4-Storey Shophouses on Lot 205 & 206 Plus Roof on Lots 205-207, Section 49, Jalan Abell, Kuching, Sarawak for Public Mutual Berhad (Phase 1 Works).
Year 2018
  • Proposed  Minor Renovations Works for Sarawak CBOM Regional Office at HLBB Kuching Branch 2nd Floor, No.42, Jalan Pending, 93450 Kuching, Sarawak.
Year 2017
  • Reinstatement Works to Offsite ATM Premises for Hong Leong Bank Berhad.
Year 2015
  • The Renovation of H&M at The Spring, Kuching.
Year 2012
  • The Execution And Completion Of Proposed Interior Design Fit-Out Of IDS+Programming & Services Centre, Wisma Great Eastern, Lot 51, Travillion Commercial Centre, 93100 Kuching, Sarawak.
  • Proposed Interior Fir Out Works to Hong Leong Assurance Berhad’s Kuching Branch 22B & 22C Jalan Rubber Lot 342 & 342 Section 9, 93400 Kuching.
Year 2011
  • Proposed Renovation Works for Public Mutual Berhad At Lot 1380 (Ground Floor & 1st Floor) & Lot 1381 (1st Floor), Block 10, Center Point Commercial Centre, Jalan Kubu, Miri, Sarawak.
Year 2010
  • Cadangan Kerja-Kerja Pembangunan Landskap Dan Esplanade Di Jalan Gambier, Kuching.
  • Proposed Renovation and Extension to Existing Single Storey Nursing Home on Lot 3476, Block 11, MTLD at Jalan Stutong Baru, Kuching.
  • Proposed Renovation Works to Existing 3-Storey Shophouse on Sublot 15 – 19, (New Lots 3186 – 3190) Block 233, KNLD, Sentosa Central, 7th Mile Bazaar, Off Jalan Penrissen, Kuching for Public Bank Berhad.
  • Proposed Renovation Works for PBB on Lot 2775 – 2776, 2778 – 2780, Block 10, KCLD, Jalan Tun Ahmad Zaidi Adruce, Kuching, Sarawak.
Year 2009
  • Proposed Renovation Works (Relocation) For Public Mutual Berhad at No. 10, Lorong 2, Jalan Tuanku Osman, 96000 Sibu, Sarawak.
  • Extension To The Lodge International School On Lot 3252, Block 11, At Tabuan Jaya, Muara Tebas Land District, Kuching.
  • Proposed Renovation Works for PBB Stutong Parade Branch On Lot 3245 & 10641 (Sublots 71 – 73), Block 11, MTLD at Jalan Stutong Baru, Kuching.
  • Interior Design & Fit-Out Work To Lonpac Insurance Bhd at Sibu, Sarawak.
Year 2008
  • Renovation Works To 9th, 10th & 11th Floor, Wisma Bapa Malaysia, Petra Jaya, Kuching.
  • Cadangan Ubahsuai Dalaman Di Tingkat Bawah Dan Tingkat Satu Di Bangunan 4 Tingakt Yang Sediada Di Alamat No. 433, 434 & 435, Seksyen 11, KTLF, Bangunan Tuanku Muhammad Al-Idrus, Jalan Kulas, 93400 Kuching, Sarawak Untuk Tetuan Bank Islam Malaysia Berhad.
  • Renovation Works To Bank Islam East Malaysia Regional Office (New Premise) At 4 Storey Shoplots At Lot 423, 424, 425 & 426, Jalan Kulas Barat, 93400 Kuching, Sarawak.
  • Renovation Works for Kuwait Finance House (Malaysia) Berhad, Kuching Branch At Ground Floor, No. 92, Lot 393, Menara Zecon, Section 5, KTLD, Jalan Satok, Kuching.
Year 2007
  • Renovation Works For Bank Islam Malaysia Berhad Miri Branch At Lot No. 1258, Block 9, Centre Point Commercial District, Jalan Melayu, Miri, Sarawak.
  • Interior Design & Renovation Works To New EON Bank branch at Sublot 11600 – 11602, Block 16, KCLD, RH Plaza, Jalan Stutong, Kuching.
Year 2006
  • The Execution & Completion Of The Proposed Interior Fit-Out And Renovation Works To Standard Chartered Bank Malaysia Berhad Branch At Kuching, Sarawak.
Year 2005
  •  Interior Design & Renovation Works For EON Bank Sarikei Branch At Sublot 7- 8 Of Parent Lots 970, 1670 & 1672, Block 36, Sarikei Land District At Jalan Masjid, Sarikei, Sarawak.
Year 2002
  • Renovation Works To Deputy Chief Minister And Deputy State Secretaries Office On 19th Floor And The Surau On 15th Floor At Wisma Bapa Malaysia, Petra Jaya, Kuching.
  • Interior Design Works For Basement, Ground, 1st & 2nd Floors Of The 24-16 Storey Office Tower Cum Apartment Development On Lot 376, Section 47, KTLD At Jalan Bukit Mata, Kuching.
  • I.D. Works For Basement, Ground, 1st & 2nd Floors Of The 24-16 Storey Office Tower Cum Apartment development On Lot 376, Section 47, KTLD At Jalan Bukit Mata, Kuching.
Year 2001
  • Proposed Renovation To Hong Leong Bank Berhad at No. 133, 135 & 137, Jalan Kampung Nyabor, 96000 Sibu.
  • Renovation Works To Set Up Self Service Terminal (SST) At Ground Floor of Sibu Branch Premises, Sarawak.
Year 2000
  • Proposed Renovation For HLBB Sarikei Branch, Sarawak.
Year 1998
  • Renovation And Extension To Existing Lodge School On Lot 6543, Block 11, MTLD, Taman Tabuan Desa, Lorong 4E1, OFF Jalan Keranji, Kuching.
Year 1997
  • Renovation Works To HongKong Bank At Bangunan Binamas On Lot 138, Section 54, At Jalan Padungan, Kuching, Sarawak.
Year 1995
  • Renovation & Fitting Out To Existing Ground Floor And Mezzanine Floor, Wisma Bukit Mata, Kuching On Lot 262, Section 48, KTLD, Jalan Tuanku Abdul Rahman, Kuching For Standard Chartered Bank Malaysia Berhad.
Year 1994
  • Renovation & Fitting Out At Ground, First & Second Floor On Lots 281 & 282, Lorong Rubber No. 7, Rubber Road For Ban Hin Lee Bank, Kuching.